INDUSTRIAL & PRODUCTION · ASSEMBLY LINE

Connector seating and torque check on sub-assembly

Highest composite score in the sample set. Hardware-genlocked 4D available on this take.

IMU + 6DOFLIVE TRACE
imu6DoFactionTORQUE EVENT
LAYER ALIGNMENT · industrial-1177
industrial-1177.mp4 · 6:38SYNC DRIFT 0.3 ms / 60 s
SOURCE · RGB
L1–L5 CONTROL
4D GROUND TRUTH
MOCAP
3D ASSETS
RETARGET · 5 EE

Dashed verticals are hardware sync ticks.

INGEST GATES — THIS CLIP
Hand visibility
86% (gate ≥ 50%)
IMU-to-video drift
0.3 ms / 60 s (gate < 1 ms / 60 s)
Reprojection error
1.8 px (gate < 3 px @ 1080p)
Composite score
91 / 100 (gate ≥ 70)
CAPTURE
Duration
6:38
Resolution
1920×1080 @ 30
Codec
H.265, bit-exact remux
Inertial stream
476 Hz · 6-axis
Stabilization
disabled at firmware
RETARGETING FEASIBILITY · 5 END EFFECTORS
Shadow
pass
Inspire
pass
Allegro
pass
Parallel-2F
pass
Suction
reject — geometry

Rejections are retained in the rejection set, not discarded. The set is proprietary; the algorithm is not.

CONTENT
Contact profile
bimanual · tool-mediated
Tracked objects
7
Episodes
19
Annotation
Control L1–L5, full clip
RIGHTS CHAIN
Signed by
Employer agreement · contract manufacturer
Individual consent
obtained separately · CID-…-2C9
Collection region
Asia-Pacific
Redaction
faces, plates, screens, documents — on device, pre-upload
Source retention
pre-redaction footage destroyed on a 90-day schedule

Files for this clip

Video, annotation and retargeted trajectories in your delivery format. Available as part of an evaluation subset.

Request this clip